Garberville Sanitary District wastewater project

Garberville Sanitary District Wastewater

LACO provided special inspection, field sampling and testing, and laboratory testing and analysis for improvements to an existing wastewater treatment facility. Improvements included the construction of a new wastewater-holding pond, installation of several thousand lineal-feet of pipeline, and construction of a new operations building.


LACO also provided Construction Management and Resident Engineering services for a prior GSD Collection System Improvement project. Conditions within the Highway 101 CalTrans right-of-way created challenges for the construction team. These challenges required rigorous coordination and resolution of issues to maintain safe travel through this vital corridor.


LACO staff coordinated design changes with CalTrans and helped realize completion of the project on schedule. LACO also performed pay request reviews, review of change orders, and provided recommendations during the course of construction.